|
" Bridge management 3 : "
edited by J.E. Harding, G.E.R. Parke, M.J. Ryall.
Document Type
|
:
|
BL
|
Record Number
|
:
|
739352
|
Doc. No
|
:
|
b559274
|
Main Entry
|
:
|
edited by J.E. Harding, G.E.R. Parke, M.J. Ryall.
|
Title & Author
|
:
|
Bridge management 3 : : inspection, maintenance, assessment, and repair\ edited by J.E. Harding, G.E.R. Parke, M.J. Ryall.
|
Publication Statement
|
:
|
London: Taylor & Francis, 1996
|
Page. NO
|
:
|
(xvi, 888 pages) : illustrations
|
ISBN
|
:
|
0203860837
|
|
:
|
: 9780203860830
|
Notes
|
:
|
Papers presented at the Third International Conference on Bridge Management, held at the University of Surrey, Guilford, UK, on 14-17 April 1996.
|
Contents
|
:
|
1. Bridge management objectives and methodologies --;2. Reconstruction and repair of steel highway bridges damaged by the Great Hanshin earthquake --;3. An expert system using case-based reasoning for selecting retrofitting methods of fatigue damage on steel bridges --;4. Prediction of bridge service life using time-dependent reliability analysis --;5. Reliability based reassessment of an existing concrete bridge : a case study --;6. Repair of the bascule pier of the Vislund Bridge --;7. Investigation, repair and strengthening of a viaduct's steel piers --;8. The Charmaix Viaduct (Savoy France) pier movements --;9. Investigation and rehabilitation of Tsing Yi South Bridge, Hong Kong --;10. Rehabilitation of a historic bridge over the Sand River near Virginia, South Africa --;11. Friarton Bridge strengthening --;12. Damage assessment and repair design of Dah Chih Bridge --;13. Strengthening of Langleybury Lane Bridge, Hertfordshire. 14. Emergency repairs and replacement of the 'Lange Lobrockstraat' railway bridge --;15. Repair, rehabilitation and replacement of Galata floating bridge --;16. Bascule bridge machinery rehabilitation at Hutchinson River Parkway Bridge --;17. Concrete specifications for new bridges --;18. Methodology for the assessment of the structural behaviour of concrete bridges --;19. Inspection and service life predictions of prestressed concrete cantilever bridges in Slovakia --;20. Optimisation of maintenance of concrete structures through service life calculation --;21. Relief of creep/shrinkage stresses in integrally constructed bridges --;22. Strengthening concrete bridge decks: increasing the shear capacity --;23. Application of cathodic protection to highway viaducts --;24. Design of innovative concrete bridges for South China --;25. Evolution of bridge maintenance management systems --;26. Risk-based approaches to economic appraisal load assessment and management of bridges : a review --;27. Bridge management systems: the need to retain flexibility and engineering judgement --;28. The association of ettringite with the cracking of in-situ bridge concrete --;29. Assessment of concrete bridges with inadequately anchored reinforcement. 30. Open spandrel masonry arch bridges --;31. Assessment and reconstruction of arch structures over the Basingstoke Canal --;32. Behaviour of skewed brickwork arch bridges --;33. Preservation and seismic strengthening of Donner Summit arch bridge --;34. Mass concrete arches --;35. Arch bridges Nanin and Cascella at the San Bernardino Pass, Switzerland --;36. Structural modification of the two-hinged arch Semimaru bridge --;37. Load test on a cast iron jack arch bridge --;38. Replacement of steel and composite bridges without traffic interruption --;39. Maintenance, service life and total cost of steel bridges in urban elevated highways --;40. Field stress measurements of a plate girder bridge carrying a 116 ton truck --;41. Linearised fatigue assessment procedure for welded components in bridge structures --;42. Investigation of the vibration behaviour of the Mukogawa exit ramp : a 7-span continuous curved girder bridge --;43. Evaluation of aluminium bridge systems. 44. Finite element model optimisation of a large bridge based on dynamic testing --;45. Possibility of fatigue-free steel girder bridges with simple transverse-stiffening systems based on large 3D FEM analysis --;46. Ultimate capacity analysis of bridges with deteriorated connections or members --;47. Aesthetic aspects of widening and rehabilitating historic bridges --;48. Influence of maintenance on the design of highway structures --;49. Replacement of motorway overbridges maintaining continuous motorway traffic --;50. Long-term slab-girder interaction in strengthen bridge decks --;51. A parameter study of the strengthening of reinforced concrete beams with bonded composites --;52. Road bridges strengthened by epoxy bonded steel plates --;53. Upgrading reinforced concrete beams by bolting steel side plates --;54. Peeling failure of reinforced concrete beams with externally bonded steel plates --;55. Bridge enclosure : facilitating construction inspection, maintenance, upgrading and operation --;56. Surface-applied inhibitor in rehabilitation of the Peney Bridge, Geneva, Switzerland --;57. Surface treatment standards to support owners, consulting engineers, contractors and suppliers. 58. Assessment of the protection against corrosion provided by repair systems --;59. Repair materials for civil engineering construction : Belgian experience --;60. A3/A31 Flyover : case history of an extremely post-tensioned bridge --;61. Evaluation of effects due to creep and shrinkage in existing prestressed concrete girders strengthened by external cables --;62. Increase of the load-bearing capacity of reinforced concrete bridges by supplementary post-tensioning : Hungarian examples --;63. Prestressing cables inspection and assessment by means of the reflectometric method (RIMT) --;64. Non-ferrous prestressing and reinforcement for concrete highway bridges --;65. On the collapse of a cable-stayed bridge at Nienburg : a Nineteenth Century disaster revisited --;66. Axial fatigue life prediction of bridge cables. 67. Replacement of single cables in cable stayed and suspension bridges --;68. Seismic vulnerability evaluation of the Tacoma Narrows Bridge --;69. Investigation and load testing of a steel latticed truss viaduct --;70. Assessment, repairs, and refurbishment of a steel latticed truss viaduct --;71. Captain William Moore Creek bridge rehabilitation --;72. A risk-based framework for assessment and prioritisation of bridges --;73. Development of a bridge management system in Japan --;74. Planning bridge maintenance in Poland using a BMS based on a taxonomic investigation --;75. Information system for management of bridges owned by the Province of Perugia, Italy --;76. Whole life costing in road bridges applied to service life prediction --;77. Effective maintenance of the bridge stock in Finland --;78. Innovative solutions for unusual bridge maintenance problems in South Africa --;79. White Cart Viaduct : inspection, maintenance and design --;80. In service monitoring of A38 Motorway overbridge, Bristol. 81. M1 Motorway, Wilsthorpe Lodge Bridge --;82. Inspection and maintenance facilities for the Thelwall New Viaduct --;83. Investigation and strengthening study of twenty damaged bridges : a Belgium case history --;84. Assessment of reinforced concrete bridges: collapse tests on Thurloxton Underpass --;85. Supplementary load testing of Mellor Spodden concrete arch bridges --;86. Special inspection of post-tensioned concrete bridges on the M4 Motorway in Berkshire --;87. Assessment and design of unreinforced masonry parapets --;88. Dynamic monitoring as a tool for long span bridges --;89. Potential for friction welding in bridge structures --;90. Durability design : applying data from materials research and deteriorated structures --;91. The use of advanced composite materials in strengthening and maintaining bridges --;92. Strengthening of the Quinton Bridges with externally bonded steel plate reinforcement --;93. A stressmeter for assessing the in-situ stresses in concrete bridge structures --;94. Stress redistribution and structural reserves in prestressed concrete bridges --;95. The assessment of stress resultants and displacements in bridge decks by the use of distribution coefficients. 96. Analysis and assessment of bridges with minimal transverse reinforcement --;97. Traffic load assessment of bridges by permanent stress measurement --;98. Considering actual traffic during bridge evaluation --;99. Durability enhancement of half joints --;100. The mitigation of structure-borne noise on a steel railway bridge using a polyurethant resilient track isolation system --;101. Assessment and rehabilitation of a fractured bascule bridge --;102. New developments on orthotropic steel bridge decks : fatigue tests --;103.
|
|
:
|
The effectiveness of silane for extending the life of chloride-contaminated reinforced concrete --;104. The role of economic evaluation in the bridge management process --;105. Tamar Bridge : maintenance, assessment, strengthening --;106. Hagwilget Suspension Bridge : increasing capacity without strengthening.
|
Abstract
|
:
|
Bridges need substantial investment in maintenance and upgrading if they are to function effectively throughout their planned life. This volume provides an overview of the latest international thinking on cost-effective engineering management of bridge structures.
|
Subject
|
:
|
Bridges -- Inspection -- Congresses.
|
Subject
|
:
|
Bridges -- Inspection.
|
Subject
|
:
|
Bridges -- Maintenance and repair -- Management -- Congresses.
|
LC Classification
|
:
|
TG315.E358 1996
|
Added Entry
|
:
|
G A R Parke
|
|
:
|
Institution of Civil Engineers (Great Britain)
|
|
:
|
J E Harding
|
|
:
|
M J Ryall
|
| |