|
" Bow ties in risk management : "
Center For Chemical Process Safety of The American Institute Of Chemical Engineers, New York, NY, and Energy Institute, London, UK.
Document Type
|
:
|
BL
|
Record Number
|
:
|
840463
|
Title & Author
|
:
|
Bow ties in risk management : : a concept book for process safety /\ Center For Chemical Process Safety of The American Institute Of Chemical Engineers, New York, NY, and Energy Institute, London, UK.
|
Publication Statement
|
:
|
Hoboken, NJ :: John Wiley & Sons, Inc. ;[New York, NY] :: American Institute of Chemical Engineers,, 2018.
|
|
:
|
, ©2018
|
Series Statement
|
:
|
Process safety guidelines and concept books
|
Page. NO
|
:
|
1 online resource (xv, 357 pages)
|
ISBN
|
:
|
1119490340
|
|
:
|
: 1119490359
|
|
:
|
: 1119490383
|
|
:
|
: 1523119705
|
|
:
|
: 9781119490340
|
|
:
|
: 9781119490357
|
|
:
|
: 9781119490388
|
|
:
|
: 9781523119707
|
|
:
|
9781119490395
|
Bibliographies/Indexes
|
:
|
Includes bibliographical references and index.
|
Contents
|
:
|
Intro; BOW TIES IN RISK MANAGEMENT; CONTENTS; LIST OF TABLES; LIST OF FIGURES; ACRONYMS AND ABBREVIATIONS; GLOSSARY; ACKNOWLEDGMENTS; ONLINE MATERIALS ACCOMPANYING THIS BOOK; PREFACE; 1 INTRODUCTION; 1.1 PURPOSE; 1.2 SCOPE AND INTENDED AUDIENCE; 1.3 ORGANIZATION OF THIS CONCEPT BOOK; 1.4 INTRODUCTION TO THE BOW TIE CONCEPT; 1.4.1 Reason's Swiss Cheese, Models of Accident Causation and Bow Ties; 1.4.2 History and Regulatory Context of Bow Ties; 1.4.3 What Bow Ties Address; 1.4.4 Key Elements of a Bow Tie; 1.4.5 Benefits of Bow Ties; 1.4.6 Linkage between Bow Ties, Fault Trees, and Event Trees.
|
|
:
|
1.5 CONCLUSIONS2 THE BOW TIE MODEL; 2.1 BOW TIE MODEL ELEMENTS; 2.2 HAZARD; 2.2.1 Hazard: Characteristics; 2.2.2 Formulating the Hazard; 2.2.3 Hazard Examples; 2.3 TOP EVENT; 2.3.1 Top Event: Characteristics; 2.3.2 Formulating the Top Event; 2.3.3 Top Event Examples; 2.4 CONSEQUENCES; 2.4.1 Consequences: Characteristics; 2.4.2 Formulating Consequences; 2.4.3 Consequence Examples; 2.5 THREATS; 2.5.1 Threats: Characteristics; 2.5.2 Formulating Threats; 2.5.3 Threat Examples; 2.6 BARRIERS; 2.6.1 Barriers: Concept and Location on Bow Tie; 2.6.2 Barriers: Type and Characterization.
|
|
:
|
2.6.3 Barrier Properties2.6.4 Metadata; 2.6.5 Barrier Examples; 2.7 DEGRADATION FACTORS AND DEGRADATION CONTROLS; 2.7.1 Degradation Factors: Characteristics; 2.7.2 Degradation Controls: Concept and Location on Bow Tie; 2.7.3 Use Degradation Factors and Degradation Controls Sparingly; 2.7.4 Degradation Factors and Degradation Control Examples; 2.7.5 The Level of Detail Should Match the Goal and Audience of the Bow Tie; 2.8 CONCLUSIONS; 3 BOW TIE DEVELOPMENT; 3.1 RATIONALE FOR BOW TIE DEVELOPMENT; 3.2 BOW TIE WORKSHOP; 3.2.1 Bow Tie Workshop Pre-Work; 3.2.2 Workshop Team.
|
|
:
|
3.2.3 The Bow Tie Workshop3.3 POST-BOW TIE WORKSHOP ACTIVITIES AND QUALITY CHECKS; 3.4 CONCLUSIONS; 4 ADDRESSING HUMAN FACTORS IN BOW TIE ANALYSIS; 4.1 HUMAN AND ORGANIZATIONAL FACTORS FUNDAMENTALS; 4.1.1 Introduction; 4.1.2 Human and Organizational Factors -- Conventional Approach; 4.1.3 Human and Organizational Factors -- New Paradigm; 4.1.4 Human Failure as a Degradation Factor; 4.2 STANDARD AND MULTI-LEVEL BOW TIE APPROACHES; 4.2.1 Standard Bow Tie Approach; 4.2.2 'Multi-Level Bow Tie' Extension; 4.2.3 Comparison of Multi-Level and Generic Human Factors Bow Ties.
|
|
:
|
4.3 HUMAN AND ORGANIZATIONAL FACTORS AS A BARRIER OR DEGRADATION CONTROL4.3.1 Barriers; 4.3.2 Degradation Controls; 4.3.3 Training and Competence; 4.4 VALIDATING HUMAN PERFORMANCE IN BARRIERS AND DEGRADATION CONTROLS; 4.5 QUANTIFYING HUMAN RELIABILITY IN BOW TIES; 4.6 CONCLUSIONS; 5 PRIMARY USES OF BOW TIES; 5.1 PRIMARY USE EXAMPLES; 5.2 LINKING BOW TIES TO THE RISK MANAGEMENT SYSTEM; 5.2.1 Uses for Bow Ties -- Design Verification; 5.2.2 Uses for Bow Ties -- Communication and Management of Barriers and Degradation Controls; 5.2.3 Uses for Bow Ties -- Risk Management during Operations.
|
Abstract
|
:
|
"Explains how to construct bow ties of high practical value for operationalizing barriers, avoiding common pitfalls, with realistic examples -Explains how to treat human and organizational factors in a sound and practical manner -Proposes a standardization of terminology and definitions associated with bow ties by drawing on a wealth of industry experience from well-known experts -Explains how to apply the bow tie method to create high value organizational learning from incidents and audits -Explains the practical application and value of bow ties in plant management and active risk management, from the control room to the board room Marketing Description: -Members of: AIChE, CCPS, ISA, ASME, ASSE, ACS, AIHA, OSHA, ICMA, European Process Safety Centre (EPSC), American Chemistry Council (ACC) -Members of trade associations such as API, NPRA, ACC and SOCMA in the US and similar associations around the world -Readers of: Journals of the societies mentioned above, Chemical Engineering, Chemical Engineering Progress, C & E News"--
|
Subject
|
:
|
Chemical plants-- Safety measures.
|
Subject
|
:
|
Organizational learning.
|
Subject
|
:
|
Risk management.
|
Subject
|
:
|
Chemical plants-- Safety measures.
|
Subject
|
:
|
Organizational learning.
|
Subject
|
:
|
Risk management.
|
Subject
|
:
|
SCIENCE-- Chemistry-- Industrial Technical.
|
Subject
|
:
|
TECHNOLOGY ENGINEERING-- Chemical Biochemical.
|
Dewey Classification
|
:
|
660/.2804
|
LC Classification
|
:
|
TP150.S24B69 2018
|
Added Entry
|
:
|
American Institute of Chemical Engineers., Center for Chemical Process Safety,author.
|
|
:
|
Energy Institute (Great Britain)
|
Parallel Title
|
:
|
Bowties in risk management
|
| |